At Hardy Seas, our journey began in 2021 with a clear mission: to seamlessly integrate our expertise in construction, maintenance projects, and marine operations.
With a strong foundation in Project & Mechanical Engineering, complemented by hands-on experience in skippering charter vessels, we bring a unique blend of skills to every project we undertake.
Operating across the state, we partner with clients to deliver a wide range of projects and marine operations. Some of our notable collaborations include:
Shiploader maintenance support - Cape Cuvier
Hardy Seas supported shiploader and jetty maintenance works at Cape Cuvier / Lake MacLeod by providing more effective rescue solutions.
Dolphin and wharf maintenance support at Mistaken Island
Provided rescue vessel support for maintenance and refurbishment activities.
Dampier Gangway Replacement - Mistaken Island
Hardy Seas provided standby rescue vessel services during the replacement of a marine gangway structure at Mistaken Island, Dampier. The confined water environment required a PWC-based rescue vessel to navigate around the existing jetty infrastructure and maintain continuous water safety coverage throughout the works.
Shiploader Tripper Replacement - Port Hedland
Hardy Seas provided project and mechanical engineering support for shiploader tripper replacement works at Port Hedland, one of Australia's busiest bulk export ports.
Mistaken Island Jetty Replacement - Dampier
Hardy Seas assisted with Project Engineering for the replacement of the Dampier Jetty and outloading conveyor.
Replacement of Small Boat Landing - Cape Cuvier
Hardy Seas assisted with project engineering for the replacement of a small boat landing structure at Cape Cuvier on the WA mid-west coast.
Jetty Refurbishment - Cape Cuvier
Hardy Seas provided project engineering support throughout jetty refurbishment works at Cape Cuvier.
Anchor Tensioning for the Underwater Observatory - Busselton Jetty
Assisted with anchor tensioning works for the underwater observatory at Busselton Jetty, one of the longest timber piled jetties in the Southern Hemisphere.
Replacement of CV002 Stacker - Lake Macleod
Hardy Seas provided proj3ct engineering assitance for the replacement of the CV002 stacker at the Lake Macleod salt production operation near Carnarvon, WA.
Twin Boom Stacker Tripper Replacement - Port Hedland
Hardy Seas assisted with project and mechanical engineering support for the twin boom stacker tripper replacement works at Port Hedland.
Project engineering for replacement of Overland Conveyor Belts - Western Turner Syncline, Tom Price
Hardy Seas provided engineering services for overland conveyor belt replacements at the Western Turner Syncline iron ore operation near Tom Price in the Pilbara.
KBSB Wharf Remediation – Dampier WA
Berth 3 Shiploader Maintenance Shutdowns – Port Hedland WA
Cyclone Zelia Repairs – Port Hedland WA
Syphons Replacement – Port Hedland WA
Dump Bridge Refurbishment – Lake Macleod WA
Whether you require engineering expertise or marine solutions, we invite you to connect with us to discuss how we can meet your specific needs.